Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained, confirmed and applied from relevant information for planning and preparation.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
- Environmental requirements are identified in accordance with environmental plans and statutory and regulatory authority obligations and are applied.
- Identify and select hand, power and pneumatic tools.
- Hand tools and power and pneumatic tools, their functions, operations and limitations are identified and selected.
- OHS requirements for using hand, power and pneumatic tools are recognised and adhered to.
- Pre-operational checks, including lubricants, hydraulic fluid and water, are completed according to manufacturer recommendations.
- Use tools.
- Identify, select and use plant and equipment.
- Plant and equipment are selected and used consistent with OHS requirements and the needs of the job.
- Pre-operational checks, including lubricants, hydraulic fluid and water, are completed according to manufacturer recommendations.
- Plant and equipment are maintained in accordance with manufacturer recommendations and standard work practices.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.