Elements and Performance Criteria
- Plan and prepare.
- Job requirements are obtained, confirmed and applied to planning.
- Work site is inspected and terrain level checked to determine stabilising and safe working area requirements.
- Work site conditions and hazards are assessed and site health and safety requirements confirmed and applied to planning.
- Safe work method statement (SWMS) for the type of EWP and job and work site requirements is reviewed with relevant personnel and confirmed.
- Plant, tools and equipment, including personal protective equipment (PPE), are selected according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Verbal and non-verbal communication signals are confirmed with team members, supervisor, and other personnel working on site, as required.
- Rescue plan, including use of fall arrest system, is established and practised before using EWP.
- Locate EWP in place.
- Work site is inspected and terrain level checked to determine stabilising and safe working area requirements.
- Work site conditions and hazards are assessed and site health and safety requirements confirmed and applied to planning.
- Safe work method statement (SWMS) for the type of EWP and job and work site requirements is reviewed with relevant personnel and confirmed.
- Plant, tools and equipment, including personal protective equipment (PPE), are selected according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Verbal and non-verbal communication signals are confirmed with team members, supervisor, and other personnel working on site, as required.
- Rescue plan, including use of fall arrest system, is established and practised before using EWP.
- Conduct routine checks of EWP.
- Routine pre-operational equipment checks are carried out according to operator manual or manufacturer specifications, and logbooks for defect checks and EWP maintenance schedules.
- Equipment is switched on in line with start-up procedures, and controls are checked for correct operation and ease of movement.
- EWP is checked to ensure that emergency safety devicesspecified in operator manual are present and operating correctly.
- Tools, equipment and materials are placed into bucket or on platform according to job application requirements.
- Elevate platform to work location.
- EWP controls are operated according to manufacturer recommendations and platform is elevated to work position.
- Power is switched off where specified and locking devices are engaged according to operator manual.
- Work is carried out according to job specification, operator manual, and health and safety requirements.
- Lower platform and shut down.
- Shut-down procedures are carried out according to operator manual instructions and equipment is switched off.
- EWP, tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices.
- Work completion procedures are applied and relevant personnel notified that work is finished.