Elements and Performance Criteria
- Plan and prepare.
- Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Plant, tools and equipment are selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
- Apply safe work practices.
- Relevant authorities are contacted to identify electrical sources and type.
- Plant is positioned according to work method statement and job safety analyses (JSAs).
- Plant procedures are followed to comply with work method statement and JSAs.
- Work is conducted in or around the power source, service or asset.
- Personnel, plant and equipment are retracted from powered area following safe work method statement and JSAs.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
- Work completion procedures are applied and relevant personnel are notified that work is finished.