Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- Materials quantity requirements are calculated in accordance with plans, specification and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
- Prepare for concrete resurfacing.
- Concrete is prepared for resurfacing technique to be applied.
- Resurfacing and preparation equipment is selected for the process.
- Retardant materials are prepared for application where specified.
- Preparation technique is performed using the selected application according to specifications.
- Existing control joints in the substrate are checked to ensure they are carried through and reflected in the proposed topping.
- Cure/seal concrete.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.