Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Assess concreting site and scope of work.

Required Skills

Required skills

learning skills to develop and build understanding of

types of concrete materials

properties and behaviour of concrete in different environmental conditions

numeracy skills to calculate dimensions of pour and resource requirements

oral communication skills to

brief team members on work specifications and requirements

liaise with site personnel

reading skills to interpret site plans and work specifications

writing skills to develop or adapt SWMS

Required knowledge

project management principles and strategies relevant to concrete work

regulations and standards relevant to concrete work

AS Concrete structures

environmental

WHS

risks hazards and contingencies relevant to concrete work and effective management strategies

role and responsibilities of construction site personnel

skills plant tools equipment and materials required for concrete work

terminology used on construction sites in relation to concreting and other trades

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

This unit of competency could be assessed by performing the mandated tasks in the workplace or a close simulation of the workplace environment provided that simulated or projectbased assessment techniques fully replicate construction workplace conditions materials activities responsibilities and procedures

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person should demonstrate the ability to

predict the number of resources and time required to complete three separate concrete projects each measuring a minimum of square metres and identify skill requirements for each project

identify and source appropriately skilled workers to complete the concreting work

brief the concreting team on the work to be completed and quality requirements of the finished work

Context of and specific resources for assessment

Assessment of this unit

must be in the context of the work environment

may be conducted in an offsite context provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance including task skills task management skills contingency management skills and job role environment skills

must meet relevant compliance requirements

Resource implications for assessment include

an induction procedure

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

support materials appropriate to activity

Method of assessment

Assessment for this unit must verify the practical application of the required skills and knowledge using a combination of the following methods

direct observation of tasks in real or simulated work conditions

questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

review of relevant authenticated documentation from third parties such as existing supervisors team leaders or specialist training staff

Guidance information for assessment

This unit could be assessed on its own or in combination with other units relevant to the job function

Reasonable adjustments for people with disabilities must be made to assessment processes where required This could include access to modified equipment and other physical resources and the provision of appropriate assessment support

Assessment processes and techniques should as far as is practical take into account the language literacy and numeracy capacity of the candidate in relation to the competency being assessed


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Work specifications may include:

instructions issued by authorised organisational and external personnel

regulatory and legislative requirements relating to concrete work, including Australian standards

safety data sheets (SDS) for substances to be used

verbal, written and diagrammatic instructions, including manufacturer specifications and instructions where specified

work schedules, plans and specifications.

Project stages must include:

work preparation:

fitting personal protective equipment (PPE)

selecting and checking tools and equipment

site preparation:

excavation

formwork

subgrade

delivery

pouring

compaction

levelling

finishing

curing

site clean-up.

Work health and safety requirements must include:

assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor

emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures

hazard control

hazardous materials and substances

PPE prescribed under legislation, regulations and workplace policies and practices relevant to concrete work

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

earth leakage boxes

lighting

power cables, including overhead service trays, cables and conduits

signage and restricted access barriers

surrounding structures

traffic control

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

working outdoors in warm climates

use of plant, tools and equipment.

Environmental requirements must include:

clean-up management

dust and noise control

stormwater management

vibration management

waste management.

Specialised skill requirements must include:

decorative concreting

cutting and coring

concrete repairs.

Material requirements must include:

concrete additives

reinforcements.

Plant, tools and equipment must include combinations of the following relevant to the tasks:

hand tools, including:

bolt cutters

crow bars

cutting knives

edging tools

floats

grinders

hammers

jointers

kneel boards

levelling equipment

long handled shovels

marking tools

measuring tapes

nail bags

picks

pinch bars

pliers

rakes

sledge hammers

steel fixing reels

string lines

wire brushes

trowels:

frezno

magnesium trowels

ride-on trowelling machine with pans or blades

stick trowels

walk behind trowels

power tools

plant and equipment:

compressors

material shifting equipment

vibrators.