Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare.

Required Skills

Required skills

learning skills to

recognise signs indicating undiscovered hazards on a demolition site for example presence of termites

respond to change such as differences in current work site environmental and sustainability requirements

numeracy skills to

estimate weight of accumulated volumes of demolition debris on suspended floors

calculate combined weight of remotecontrolled plant and demolition debris on suspended floors

check levels of lubricants in equipment

perform measurements and calculations associated with work such as when determining specified length of wall to be removed

oral communication skills to

enable clear and direct communication using questioning to identify and confirm requirements and share information

report hazards on the work site including faults in tools equipment and materials

use language and concepts appropriate to cultural differences

reading skills to

interpret documentation relating to work requirements including

drawings and specifications

job safety analyses JSA

safe work method statements SWMS

safety data sheets SDS

understand written instructions procedures and signage

writing skills to complete preoperational checklists and equipment fault forms

Required knowledge

basic principles of structural engineering regarding loads on suspended floors

general construction terminology

hazards associated with the operation of remotecontrolled plant on residential commercial and industrial demolition sites

methods for materials storage and disposal including environmentally friendly waste management

method of operation and maintenance requirements of remotecontrolled plant and attachments

types characteristics uses and limitations of remotecontrolled plant in the demolition industry

workplace and equipment safety requirements

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

This unit of competency could be assessed by observation of onsite operation of remotecontrolled plant and the use of different attachments to complete demolition tasks on large buildings working as part of a team

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person should demonstrate the ability to complete the following mandatory demolition tasks

fit and secure grapples buckets and hydraulic hammers and remove maintain and store attachments after use

position plant appropriately and load a truck with building rubble using a bucket

progressively and with reference to the preplanned and controlled sequencing of tasks outlined in the demolition plan logically demolish all or part of three different types of buildings or structures including breaking up a concrete floor or structure using a hydraulic hammer attachment

segregating building materials effectively for recycling or disposal

a person should also demonstrate

knowledge of the requirements procedures and instructions for conducting demolition remotecontrolled plant operations

implementation of requirements procedures and techniques for the safe effective and efficient completion of demolition remotecontrolled plant operations including

working with others to undertake and complete demolition remotecontrolled plant operations that meet all of the required outcomes

consistent timely completion of demolition remotecontrolled plant operations that safely effectively and efficiently meet the required outcomes

Context of and specific resources for assessment

Assessment of this unit

must be in the context of the work environment

must meet relevant compliance requirements

Resource implications for assessment include

an induction procedure

realistic tasks covering the mandatory task requirements

relevant specifications and work instructions

plant tools and equipment as listed appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

information relevant to each task such as safety data sheets work plans and approved specifications forms and procedures manuals

Method of assessment

Assessment for this unit must verify the practical application of the required skills and knowledge using a combination of the following methods

direct observation of mandated tasks

questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

review of relevant authenticated documentation from third parties such as existing supervisors team leaders or specialist training staff

Guidance information for assessment

This unit could be assessed on its own or in combination with other units relevant to the job function

Reasonable adjustments for people with disabilities must be made to assessment processes where required This could include access to modified equipment and other physical resources and the provision of appropriate assessment support

Assessment processes and techniques should as far as is practical take into account the language literacy and numeracy capacity of the candidate in relation to the competency being assessed


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Compliance requirements may include:

Australian standards relevant to plant operation

codes of practice for plant operation

legislative and regulatory requirements for plant operation

manufacturer guidelines and specifications

organisational requirements and procedures

requirements of Employment and Workplace Relations legislation

requirements of Equal Employment Opportunity and Disability Discrimination legislation

site requirements.

Information regarding work task instructions may include:

advice and guidelines relating to regulatory and legislative requirements for mechanical demolition processes

advice and instructions from structural engineer regarding loads on suspended floors

approved demolition plan

current Australian standards relating to operating remote-controlled plant on demolition sites

diagrams or sketches

instructions issued by authorised organisational or external personnel

memos

safe work procedures relating to the conduct of mechanical demolition processes

safety data sheets

site signage

site traffic management plan

verbal, written and graphical instructions, including manufacturer specifications and instructions where specified

work bulletins

work schedules, plans and specifications.

Work health and safety requirements must comply with state or territory legislation and project safety plan may include:

emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures

handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor

hazard control

hazardous materials and substances and the safe handling or quarantining procedures for each type, including:

animal residue

asbestos

dust

lead-based paints

pesticide residue

personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including operational risk assessment and treatments associated with:

falling objects

lighting

load bearing capacities of suspended floors

plant movement

power cables, including overhead service trays, cables and conduits

restricted access barriers

surrounding structures

traffic control

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

traffic management, barriers and signage

use of tools and equipment

workplace environmental requirements.

Environmental requirements may include:

clean-up management

dust and noise control

sedimentation control

vibration management

waste management.

Attachments may include:

backhoe

buckets

buckets, including 4:1 buckets

chain digger

clamshell buckets

concrete crushers

concrete cutter or saw

crushing jaws

dozer blade

drilling equipment

forklift

front end loader (FEL)

grabs

grapples

hammer

metal shears

planers

power broom

profiler

pulverisers

rippers

rock breakers

rotary hoe

saws

scabblers

scarifier

shears

side angling device

tiller/mixer

vibrating plates.

Checks must include for:

bulges

factures

leaks

splits.

Site inspection may include:

assessing condition of property and surrounds

communicating with those who may be affected by the demolition task

determining floor loadings

erecting scaffolding

identifying hazardous materials

identifying position of hoses and cables clear of hazards

installing supports and bracing

location of signage and barricades

providing for site safety.

Safe operating techniques for remote-controlled plant loaders may include:

emergency shut-down and stopping

management of hazards and risks, including:

bridges

buildings

cuttings

embankments

excavations

fires

hazardous materials

overhead and underground services

structures

traffic

trees

uneven or unstable terrain

safe parking practices ensuring:

access ways are clear

equipment or machinery is:

located a safe distance from excavations

located away from overhangs and refuelling sites

secured from unauthorised access or movement.

Hazards arising from demolition process may include:

dust

fire

noise

vibration.

Demolition tasks that may be completed using remote-controlled plant and attachments include:

controlled collapse of structures by:

pulling using cables

pushing

demolition of:

buildings

chemical or manufacturing plants

chimneys

tanks

towers

excavation of:

basements

footings

slabs

loading materials

processing and sorting materials.

Communication may include the use of:

hand signals

mobile equipment

radios.

Operator maintenance tasks:

must include:

cleaning

authorised servicing

monitoring, recording and reporting faults

may include:

authorised minor replacements

assisting maintenance personnel during maintenance and repair activities.