Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- Safety (OHS) requirements, including the use of personal protective equipment, are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied.
- Set up machine.
- Machines to be used and sequence of machining are selected according to machining processes to be carried out.
- Safety procedures associated with each machine are identified in accordance with manufacturer's operating procedures, OHS requirements and AS1473 Guarding and safe use of woodworking machinery or equivalent.
- Routers/cutters are installed to manufacturer specifications with fences and stops secured in place.
- Guarding is secured in position to manufacturer specifications and AS1473.
- Work area is prepared for machining.
- Components are selected for respective machining processes.
- Machine components.
- Components are correctly positioned on machine and securely clamped where required.
- Machine is operated to designed operating procedures and AS1473.
- Components are machined accurately to set out lines and template.
- Process is completed with all components machined to specification and set-out requirements.
- Clean up.