Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied.
- Select and prepare materials and components.
- Assemble strings and newels.
- Install treads and risers.
- Assemble and install landings.
- Install handrail and balustrade.
- Install spiral stair and curved strings.
- Location of stair and first step is accurately marked on floor and central post is erected into true position, fixed at floor and temporarily braced at top.
- Initial string section is temporarily supported in place for assembly, and treads and risers are fitted and fixed into position to specification.
- Stair is progressively developed with the extending, supporting and fixing of curved string, and completed with head secured to floor/landing, balustrade installed and central post fixed to specifications.
- Secure stair to structure and line spandril area.
- Clean up.