Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
- Install blanket insulation to walls.
- Stud configuration is identified for installation processes.
- Safety wire mesh is installed to plans and specifications.
- Insulating blanket is installed in full length runs where practicable or, if joined, joints are made at centre of frame member, according to plans and specifications.
- Adjacent runs of blanket insulation is abutted with closed joints.
- Install acoustic systems.
- Acoustic materials are selected to manufacturer specifications for the walls and ceiling.
- Sheeting or ceiling tile material is selected for use in buildings requiring acoustic properties in accordance with manufacturers' weighted sound reduction index (RW rating).
- Plaster sheeting and acoustic tile materials are fixed to walls and ceiling in accordance with specifications.
- Sealant is selected and used to manufacturer specifications.
- Clean up.