Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
- Identify faults.
- Determine causes of faults and recommend rectification.
- Investigation is conducted to establish cause of faults, including accessing substrate if necessary.
- Faults in structure or substrate are communicated to appropriate personnel.
- Plaster rectification is planned to achieve desired level of finish and rectification of faults is observed.
- Permission to proceed with planned rectification is sought and obtained.
- Rectify faults.