Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
- Inspect equipment.
- Identify and assess impact of faults on work requirements.
- Faults are identified and assessment made of potential effect of the fault on operation of equipment for the required work.
- Faults that may affect the safe operation of the equipment are reported to appropriate personnel for rectification, and equipment is tagged and set aside for repair.
- Accurate reporting of the results of the inspection and testing is made in accordance with statutory requirements and company policy.
- Records are clear, unambiguous and concise with clear reference made to items that may require replacement or repair in the future.