Elements and Performance Criteria
- Plan and prepare.
- Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied for the scope of work performed.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Plant, tools and equipment selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
- Receive, sort and distribute roof tiling materials.
- Roof tiling products, materials and components are identified and checked for conformity to material schedule, plans, quality requirements and specifications on delivery to site.
- Handling characteristics of roof tiling material and components are identified and safe and effective handling techniques are applied in accordance with safe work method statements and workplace procedures.
- Fall safety devices are installed to roof perimeter and handled in accordance with regulatory and workplace requirements.
- Elevator is handled, assembled and erected at job location to manufacturer specifications and workplace requirements.
- Roof surface sarking and batten materials are handled and loaded onto roof and positioned ready for installation in accordance with specified tile and job specifications.
- Roof tiling material and components are sorted to suit material type and size, and stacked for ease of identification and retrieval for task sequence.
- Roof tiling material and components are transferred, loaded onto roof, supported and evenly distributed.
- Handle and remove surplus material from roof.
- Materials are handled safely and effectively according to material safety data sheets (MSDS) and regulatory authorities' requirements.
- Hazardous material is identified for separate handling by authorised personnel.
- Surplus roof tiling material and components are loaded and transferred from roof to ground.
- Materials are stored safely and effectively according to MSDS and requirements of regulatory authorities.
- Roof, guttering and downpipes are cleared free of waste and surplus material.
- Clean up
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.