Elements and Performance Criteria
- Plan surface preparation.
- Job requirements, including type of surface, are identified from drawings, specifications and instructions and type, and confirmed.
- Health and safety requirements are assessed and applied to planning.
- Tools, equipment, paint systems and materials are selected to carry out tasks consistent with job requirements, and faults are rectified or reported before starting work.
- Drop sheets are placed if required to protect floor and surrounding areas.
- Personal protective equipment (PPE) is sourced according to manufacturer specifications, and health and safety and workplace requirements.
- Signs and barricades are selected and installed according to health and safety and workplace requirements.