Elements and Performance Criteria
- Plan and prepare.
- Job requirements are obtained, confirmed and applied to planning.
- Work site is inspected, conditions and hazards are identified and reported as required, and health and safety requirements are confirmed with relevant personnel and applied to planning.
- Tools and equipmentare selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.
- Delivered shopfront components, sections and fittings are checked for completeness, unloaded carefully to protect finishes, and placed in well protected area on site.
- Arrangements are made for placement of mobile scaffolding, elevated work platforms or scissor lifts as required, according to client and workplace requirements.
- Bulkhead is prepared for installation by drilling, cutting and routering holes and openings to accept fittings and fixtures.