Elements and Performance Criteria
- Plan and prepare.
- Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
- Set out and prepare base.
- Lay plaster blockwork.
- Plaster adhesive is prepared in accordance with quantity requirements and block manufacturer recommendations.
- Plaster blocks are laid to set out line, level and plumb in accordance with plans and specifications.
- Vertical abutments with other walls are made plumb and aligned to specification.
- Surplus adhesive is removed from joints to specification requirements.
- Clean up.