Elements and Performance Criteria
- Plan and prepare.
- Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
- Prepare the work area.
- Area to receive pre-blended plasters and cement render materials is determined from plans and specifications.
- Area is masked up and protection for surrounding areas is applied.
- Mixing pump is set up and positioned to suit job requirements.
- Application area is cleared for projection plastering application.
- Barricades and signage are placed to minimise disruption to application process.
- Apply pre-blended plasters and render materials.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.