Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied.
- Move, locate and secure load.
- Shifting/anchorage points are located and identified and slings, tackles, associated lifting gear and tools are selected consistent with needs of task.
- Shifting equipment and tools are inspected and damaged work items are reported to supervisor.
- Strongbacks/stiffeners are positioned and securely attached as required.
- Load is safely slung, connected to lifting gear and packing is secured to protect load.
- Destination location is prepared to receive load.
- Load is stood vertically if necessary, safely moved to required location and secured in position.
- Clean up.