Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied.
- Prepare stone for dressing.
- Mark details on stone.
- Dress a simple moulding.
- Finish moulded stone surfaces.
- Clean up.
- Stone is cleaned using water and brush or other appropriate non-corrosive method.
- Tools and equipment are cleaned, maintained and stored.
- Work area is cleared and waste materials disposed of in an appropriate manner and in accordance with Environment Protection Authority (EPA) requirements.
- Templates are cleaned, labelled and stored for reuse.