Elements and Performance Criteria
- Prepare materials for use on a simple construction project.
- Determine component requirements and assembly sequence
- Component parts are identified from working drawings and specifications
- Processes for manufacture, assembly or other construction techniques and components are selected and applied in accordance with working drawings, specifications and established work procedures.
- Construction process is determined.
- Component parts are checked for accuracy, quality and suitability for the project according to plans, drawings, specifications and established work procedures.
- Hand tools are identified and checked for serviceability and operation in accordance with OHS legislation.
- Equipment to hold or support material during the operation of tools is selected and applied in accordance with standard work practices.
- Hand tools are used in accordance with OHS legislation.
- Equipment is selected and checked for serviceability and operation in accordance with OHS legislation.
- Equipment is safely and effectively operated in accordance with OHS legislation, and used to construct basic project
- Construct a simple project.
- Work area requirements are prepared in accordance with working drawings, specifications and established work procedures.
- Set out, levelling, construction and erection or installation of project are implemented in accordance with application and requirements for line, level and plumb in construction projects.
- Construction project is completed to specification and quality and is checked for conformity to plans and design specifications.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.