Elements and Performance Criteria
- Plan and prepare.
- Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Tools, plant and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
- Confirm the penetration and flashing requirement.
- Type of penetration and flashing is selected to match the particular need and host materials.
- Location of the penetration is identified, set out and confirmed.
- Tools, plant and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability, and any faults are rectified or reported prior to commencement.
- Complete the penetrations and flashings.
- Penetrations are completed safely and with minimal modification or damage to the host materials.
- Flashings are completed safely and with minimal modification or damage to the host materials.
- Casings, housings or other terminating points are installed and connections made in accordance with state and territory requirements.
- Proprietary sealants or caulking compounds are applied to restore the integrity of the wall or ceiling system.
- Surfaces are prepared for finishing.
- Clean up.