Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare.
  2. Prepare work area.
  3. Prepare and repair substrate.
  4. Clean up.

Required Skills

Required skills

Required skills for this unit are

communication skills to

follow instructions

read and interpret

documentation from a variety of sources

drawings and specifications

recognise procedures

report faults

enable clear and direct communication using questioning to identify and confirm requirements share information listen and understand

use language and concepts appropriate to cultural differences

use and interpret nonverbal communication such as hand signals

written skills to record results of checks and tests and relevant work completion procedures

evaluate own actions and make judgments about performance and necessary improvements

identifying and accurately reporting to appropriate personnel any faults in tools equipment or materials

organisational skills including the ability to plan and set out work

respond to change and contribute to workplace responsibilities such as current work site environmental and sustainability frameworks and management systems

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to

use a range of mobile technology such as twoway radio and mobile phones

voice and hand signals to access and understand sitespecific instructions

Required knowledge

Required knowledge for this unit is

building structures and work scheduling

characteristics compatibility and applications of waterproofing materials and adhesives

construction systems and waterproofing considerations and requirements

contaminants in waterproofing processes

flashing and termination detailing

general construction terminology

job safety analysis JSA and safe work method statements

levels and falls

material safety data sheets MSDS and the handling of hazardous materials

materials handling storage and environmentally friendly waste management

plans drawings and specifications

plant tools and equipment types characteristics uses and limitations

preparation surfaces for waterproofing application techniques

principles and considerations of water exclusion

processes for the calculation of material requirements

quality requirements

waterproofing process materials including durability compatibility applications and protection requirements

workplace and equipment safety requirements

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment provided that simulated or projectbased assessment techniques fully replicate construction workplace conditions materials activities responsibilities and procedures

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to

locate interpret and apply relevant information standards and specifications

comply with site safety plan and OHS legislation regulations and codes of practice applicable to workplace operations

comply with organisational policies and procedures including quality requirements

safely and effectively operate and use tools plant and equipment

communicate and work effectively and safely with others

as a minimum prepare for the waterproofing of a bathroom on a suspended concrete slab with fibrous cement sheeted walls at the corner junction of a masonry wall ensuring

correct identification of requirement and preparation for the work

correct selection and use of appropriate processes tools and equipment

completing all work to specification

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices safety requirements and environmental constraints

Assessment of essential underpinning knowledge will usually be conducted in an offsite context

Assessment is to comply with relevant regulatory or Australian standards requirements

Resource implications for assessment include

workplace location or simulated workplace

materials relevant to preparing surfaces for the waterproofing application

hand and power tools plant and equipment appropriate to preparing surfaces for the waterproofing application

realistic activities covering the mandatory task requirements

specifications and work instructions

Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles

Reasonable adjustments for people with disabilities must be made to assessment processes where required This could include access to modified equipment and other physical resources and the provision of appropriate assessment support

Method of assessment

Assessment methods must

satisfy the endorsed Assessment Guidelines of the Construction Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments

Validity and sufficiency of evidence requires that

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the persons demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct indirect and supplementary evidence

Assessment processes and techniques should as far as is practical take into account the language literacy and numeracy capacity of the candidate in relation to the competency being assessed

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties such as existing supervisors team leaders or specialist training staff


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions, where specified

MSDS

memos

regulatory and legislative requirements pertaining to preparation of surfaces for the waterproofing application

relevant Australian standards

safe work procedures relating to preparation of surfaces for the waterproofing application

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.

Planning and preparation include:

assessment of conditions and hazards

determination of work requirements and safety plans and policies

equipment defect identification

work site inspection.

Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor

hazard control

hazardous materials and substances, including cement and curing agents

organisational first aid

PPE prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

earth leakage boxes

lighting

power cables, including overhead service trays, cables and conduits

restricted access barriers

surrounding structures

traffic control

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

use of firefighting equipment

use of tools and equipment

workplace environmental requirements and safety.

Tools and equipment include:

angle grinders

brooms

brushes

buckets

caulking guns

chisels, including cold chisels

cutting blades

dumpy levels, laser and water levels

electric drills and screwdrivers

electric hammers

evacuating equipment

extension leads

floodlights and fans

hammers

high pressure water equipment

measuring tapes and rules

mixers and mixing apparatus

moisture meters

pump

rollers

scissors

spirit levels

straight edges

trowels

vacuum cleaners

wood floats.

Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications

workplace operations and procedures.

Materials include:

acid etching compounds

brick, block and stone

caulking compounds

cleaning and degreasing agents

concrete

fibreglass

masonry

metal (ferrous and non-ferrous)

non-metallic

plaster

primers

proprietary fillers and binders

sand and cement

sheet material

timber.

Environmental requirements include:

clean-up management

dust and noise

sand clean-up management

vibration

waste management.

Surface defects include:

contaminants

cracked or damaged brick or block work

cracks and splits

holes

inadequate substrate fall

inappropriate fixings

incompatible materials

loose fittings, pipework and work stops

missing, cracked or damaged substrate

moisture

out of plumb and level surfaces

rough imperfect surfaces

sandy, loose and flaked surface materials

sheet flutter and soundness

substrate drumming

surface depressions or dents.

Inspection and testing are to determine:

preparatory requirements

performance of the repair

filling

priming work prior to installation of the waterproofing system.

Waterproofing processes may be applied to:

below ground

external

internal.

Waterproofing may be applied as:

a liquid

a sheet

injected material.

Wet areas include:

bathrooms

en suites

food preparation areas

foundation works

kitchens

laundries

lift pits

patios and decks

planter boxes

retaining walls

roofs

showers

slabs

stair wells.

Substrates include:

aerated autoclaved concrete materials:

Hebel

Thermolite

blockwork

brickwork

cement render

ferrous and non-ferrous piping

fibrous cement sheeting

pre-cast concrete

polyvinyl chloride (PVC)

reinforced in situ concrete

timber and timber-based products

wet area plasterboard.