Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for work.
  2. Determine job requirements.
  3. Mark out job.
  4. Clean up.

Required Skills

Required skills

Required skills for this unit are

communication skills to

access information

complete workplace documentation

determine requirements

enable clear and direct communication using questioning to identify and confirm requirements share information listen and understand

follow instructions

plan and sequence tasks with others

read and interpret

drawings and specifications

documentation from a variety of sources

use language and concepts appropriate to cultural differences

use and interpret nonverbal communication such as hand signals

identifying and accurately reporting to appropriate personnel any faults in tools equipment or materials

marking out plumbing materials according to plans and specifications for the fabrication of plumbing components and applications

numeracy skills to apply measurements and calculations

organisational skills including the ability to plan and set out work

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to

access and understand sitespecific instructions in a variety of media

use mobile communication technology

Required knowledge

Required knowledge for this unit is

identification and correct use of measuring and marking out equipment

impact of accurate marking out on fabrication process work time and finished work quality

job safety analysis JSA and safe work method statements SWMS

operation requirements of equipment used for measuring and calculating

processes of marking out plumbing materials

relevant OHS regulations and PPE requirements

SI system of measurement

sources of information on characteristics and applications of materials being marked out

workplace operating procedures including required standards for marking out

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or projectbased assessment techniques fully replicate plumbing and services workplace conditions materials activities responsibilities and procedures

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of

giving instructions

locating interpreting and applying relevant information standards and specifications to marking out materials

applying safety requirements throughout the work sequence including the use of PPE

as a minimum the ability to given the plans and specifications and using any of the three development methods mark out and measure the following items of plumbing material

roofing sheets

copper tubing

polymer pipe

steel pressure pipe

and one of the following

a square and a round penetration in a roofing sheet

sheet metal square to round ducting transition

develop a sheet metal cone

develop a piece of duct work using parallel line method

all the above carried out ensuring

correct identification of requirements and details of proposed markings

correct selection and use of appropriate processes tools and equipment

completing all work to specification

compliance with regulations standards and organisational quality procedures and processes

communicating and working effectively and safely with others

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices safety requirements and environmental constraints

Assessment of essential underpinning knowledge will usually be conducted in an offsite context

Assessment is to comply with relevant regulatory or Australian standards requirements

Resource implications for assessment include

an induction procedure and requirement

realistic tasks or simulated tasks covering the minimum task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe working practices and addressing hazards and emergencies

material safety data sheets

research resources including industry related systems information

Reasonable adjustments for people with disabilities must be made to assessment processes where required This could include access to modified equipment and other physical resources and the provision of appropriate assessment support

Method of assessment

Assessment methods must

satisfy the endorsed Assessment Guidelines of the Construction Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments

Validity and sufficiency of evidence requires that

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the persons demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct indirect and supplementary evidence

Assessment processes and techniques should as far as is practical take into account the language literacy and numeracy capacity of the candidate in relation to the competency being assessed

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties such as existing supervisors team leaders or specialist training staff


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Safety (OHS) is to be in accordance with commonwealth, state and territory legislation and regulations and may include:

handling of materials

hazard control

hazardous materials and substances

PPE prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including recognising and preventing hazards associated with:

dangerous materials

surrounding structure and facilities

trip hazards

underground services

work site visitors and the public

working in proximity to others

use of firefighting equipment

use of first aid equipment

use of tools and equipment

workplace environment and safety.

Environmental requirements cover:

clean-up protection

waste management.

Quality assurance requirements may include:

Australian standards

Environment Protection Authority (EPA)

internal company quality assurance policy and risk management strategy

International Standards Organisation

site safety plan

workplace operations and procedures.

Tools and equipment include:

adjustable bevels

dividers

protractors

rulers

scribers

squares

tape measures.

Development methods may be:

parallel line development

radial line development

triangulation.

Materials may include:

cladding and timber

insulating materials for roofing, piping and ducting

piping (metal and non-metallic)

roof sheeting (metal, fibreglass and plastic)

sheet metal

steel sections.

Statutory and regulatory authorities include:

gasfitting authority

state or territory statutory authority

statutory plumbing authority.