Elements and Performance Criteria
- Prepare for work.
- Job requirements are determined and various levels are obtained.
- Safety (OHS) requirements associated with levelling activities and workplace environmental requirements are adhered to throughout the work.
- Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
- Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- Place concrete.
- Concrete mixture is prepared to meet manufacturer requirements.
- Formwork or excavation area is cleaned of excess material and debris prior to concrete placement.
- Concrete is safely transported by an approved method.
- Concrete is placed in formwork or placement site to specified depth ensuring all cavities are filled.
- Concrete is screeded to the alignment of formwork and project specified datums.
- Surface of concrete is finished according to specifications.
- Place rendering.
- Clean up.
- Work area is cleared and materials disposed of or recycled in accordance with state or territory statutory and regulatory authority legislation and workplace procedures.
- Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
- Information is accessed and documentation completed in accordance with workplace requirements.