Elements and Performance Criteria
- Prepare for work.
- Plans and specifications and any special instructions are obtained.
- Safety (OHS) requirements associated with the fabrication and installation of non-ferrous pressure piping, and workplace environmental requirements, are adhered to throughout the work.
- Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
- Tasks are planned and sequenced in conjunction with others involved in or affected by the work.
- Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- Work area is prepared to support efficient fabrication and installation of non-ferrous pressure piping.
- Identify installation requirements.
- Pipework configuration is identified from authorities' requirements, plans and specifications.
- Position of pipes and equipment is determined from plans and specifications, site requirements and so as not to cause damage or interference to surrounding structures or fittings.
- Measurements for fabrication or assembly are determined and transferred.
- Quantity and type of materials required are calculated from plans and specifications in accordance with regulatory authorities and workplace requirements.
- Materials are identified, ordered and collected in accordance with workplace procedures.
- Materials are checked for compliance with docket and order form, and for acceptable condition.
- Fabricate, install and test pipe system.
- System is set out in compliance with design drawings or instructions.
- Fixings and supports are installed to manufacturer requirements, job plans, specifications and workplace requirements.
- Pipe system is fabricated and jointed in accordance with job plans and specification, and manufacturer requirements for mechanical type joints.
- Pipe system is installed in specified location without damage or distortion to pipework or surrounding environment or other services.
- Pipe system is tested and documented to comply with job specification, authorities' requirements, standards, codes of practice and workplace requirements.
- Clean up.
- Work area is cleared and materials disposed of or recycled in accordance with state or territory statutory and regulatory authority legislation and workplace procedures.
- Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
- Information is accessed and documentation completed in accordance with workplace requirements.