Elements and Performance Criteria
- Prepare for work.
- Information, plans and specifications are obtained.
- Safety (OHS) requirements associated with planning the layout of sanitary drainage systems, and workplace environmental requirements, are adhered to throughout the work.
- Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
- Tasks are planned and sequenced in conjunction with others involved in or affected by the work.
- Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- Work area is prepared to support efficient planning of sanitary drainage systems' layouts.
- Plan system layout.
- Site inspection is undertaken to determine job requirements.
- Quantity, location and type of fixtures are determined from design drawings, plans and elevations.
- Layout of sanitary drainage system is planned in accordance with plans and relevant Australian standards.
- Sustainability principles and concepts are applied to the plan.
- Materials and fixtures required are determined from the proposed design.
- Plans are recorded in accordance with workplace requirements.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.
- Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
- Information is accessed and documentation completed in accordance with workplace requirements.