Elements and Performance Criteria
- Prepare for planning.
- Nature and scope of the planning task are identified and confirmed.
- Work health and safety (WHS) and environmental requirements associated with installation of stormwater drainage systems are adhered to throughout the work.
- Work is organised and sequenced in conjunction with others involved in or affected by the work.
- Tools and equipment required for planning, sizing and documenting the layout of stormwater drainage systems, including personal protective equipment, are selected and checked for serviceability.
- Work area in which planning process is to be conducted is prepared.