Elements and Performance Criteria
- Prepare for planning.
- Nature and scope of planning task are identified and confirmed.
- Safety (OHS) requirements associated with planning, sizing and documenting layout of gas installations, and workplace environmental requirements, are adhered to throughout the work.
- Work is organised and sequenced in conjunction with others involved in or affected by the work.
- Tools and equipment required for planning, sizing and documenting layout of gas installations, including personal protective equipment, are selected and checked for serviceability, and faults are rectified or referred for action.
- Work area in which planning process is to be conducted is prepared.
- Identify system requirements.
- Information and specifications for required work are obtained and confirmed, if necessary by site inspection.
- Regulations and Australian standards relevant to the work are consulted and applied to all aspects of the work.
- Quantity, location and type of take-off materials and fixtures are determined from plans and specifications.
- Gas installations are sized in accordance with relevant Australian standards, and statutory and regulatory authority and workplace requirements.
- Plan system layout.
- Layout of gas installations is planned in accordance with building plans, relevant Australian standards and workplace procedures.
- Materials required are specified and optimised in accordance with relevant Australian standards from proposed design.
- Plans are recorded in accordance with regulatory authorities' and workplace requirements.
- Sustainability principles and concepts are applied to work preparation and application.
- Restore work area.