Elements and Performance Criteria
- Obtain authority to undertake work on Type B gas appliances.
- Design specificationfor Type B gas appliance to be installed and commissioned is accessed, analysed, interpreted and confirmed through a detailed site inspection.
- Design specification matters requiring clarification are resolved through liaison with designer and gas authorities.
- Formal authority to proceed with installation and commissioning is obtained before commencing work, according to regulatory and code of practice requirements.
- Regulatory and code of practice recording and reporting requirements are satisfied at appropriate times throughout the work sequence.