Elements and Performance Criteria
- Prepare for work.
- Plans and specifications are obtained.
- Safety (OHS) requirements associated with installing split air conditioning, and workplace environmental requirements, are adhered to throughout the work.
- Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
- Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements.
- Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- Work area is prepared to support efficient installation of split air conditioning.
- Identify installation requirements.
- Quantity and type of material required for installation are determined from plans, specifications and relevant information.
- Materials are identified, ordered and collected in accordance with workplace procedures.
- Requirements for other services are identified and connection is planned in accordance with regulatory requirements.
- Materials and equipment are checked for compliance with standards, docket and order form, and for acceptable condition and faults are reported.
- Install and test system.
- Installation is set out in compliance with plans and specifications.
- Existing services are located and installation process is adjusted accordingly to avoid any disturbance.
- Preparatory work is carried out to specifications without unnecessary damage to surrounding structures or environment.
- Structural supports are installed in compliance with plans and specifications.
- Ducting and control panels are installed in accordance with authorities' requirements, manufacturer recommendations, plans and specifications.
- System is installed to manufacturer recommendations, plans and specifications.
- Installation is tested in accordance with specifications, codes or standards for the application.
- Test results are documented in required format.
- Clean up.
- Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures.
- Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
- Documentation is completed in accordance with workplace requirements.