Elements and Performance Criteria
- Prepare for work.
- Plans and specifications are obtained.
- Safety (OHS) requirements associated with installing air conditioning control equipment, and workplace environmental requirements, are adhered to throughout the work.
- Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
- Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements.
- Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- Work area is prepared to support efficient installation of air conditioning control equipment.
- Identify installation requirements.
- Install control equipment.
- Air conditioning system is shut down and isolated according to appropriate codes of practice and OHS requirements.
- Control equipment is installed to specification or manufacturer instructions and faults are reported.
- Control equipment is positioned in specified location without damage or distortion to surrounding environment or other services.
- Manual lifting and handling equipment is used in accordance with OHS requirements.
- Calibrate and test control equipment.
- Clean up.
- Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures.
- Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
- Documentation is completed in accordance with workplace requirements.