Elements and Performance Criteria
- Prepare for design.
- Nature and scope of design task are identified and confirmed.
- Work health and safety (WHS) and environmental requirements planning, sizing and documenting the layout of heating and cooling systems are adhered to throughout the work.
- Work is organised and sequenced in conjunction with others involved in or affected by the work.
- Tools and equipmentrequired for designing, sizing and documenting the layout of heating and cooling systems, including personal protective equipment, are selected and checked for serviceability.
- Work area in which design process is to be conducted is prepared.