Elements and Performance Criteria
- Prepare for work.
- Plans and specifications are obtained.
- Safety (OHS) requirements associated with selecting and installing industrial roof components, and workplace environmental requirements, are adhered to throughout the work.
- Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
- Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements.
- Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
- Work area is prepared to support efficient selection and installation of industrial roof components.
- Identify installation requirements.
- Industrial roof components are identified from plans and specifications and are compatible with adjacent materials and other relevant information.
- Proposed sealant, fixing materials, and roofing and flashing materials are selected and checked for compliance with plans, specifications and relevant Australian standards.
- Materials are identified, ordered and collected in accordance with workplace procedures.
- Materials and equipment are checked for compliance with docket and order form and for acceptable condition, and faults are reported.
- Sustainability principles and concepts are applied to work preparation and application.
- Location of installation and opening size are identified from plans and manufacturer specifications.
- Location is checked for obstructions that may affect the installation.
- Install roof components.
- Where required, the industrial component is erected to comply with manufacturer recommendations.
- Industrial roof component is set out to comply with plans, specifications and site measurements.
- Structural supports are installed to comply with plans and specifications.
- Openings are prepared to comply with plans, specifications and relevant Australian standards.
- Mullions, frames, baffles, sheeting and louvre blades are located and fixed to comply with manufacturer recommendations.
- Component is installed to comply with plans, specifications and manufacturer requirements.
- Flashing and waterproofing, including proprietary or purpose-made flashing, are installed to comply with relevant Australian standards, plans, specifications, manufacturer recommendations and regulatory authorities' requirements.
- Installation is performance tested and remedied as required.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.
- Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
- Documentation is completed in accordance with workplace requirements.