Elements and Performance Criteria
- Prepare for work.
- Information, plans and specifications are obtained for planned work activity.
- Safety (OHS) requirements associated with planning the layout of sanitary plumbing systems, and workplace environmental requirements, are adhered to throughout the work.
- Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
- Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements.
- Tools and equipment for planning the layout of sanitary plumbing systems, including personal protective equipment, are selected and checked for serviceability.
- Work area is prepared to support efficient planning of the layout of sanitary plumbing systems.
- Plan system layout.
- Site inspection is undertaken to determine job requirements.
- Quantity, location and type of fixtures are determined from design drawings, plans and elevations and other relevant information.
- Layout of sanitary plumbing system is planned in accordance with plans and relevant Australian standards.
- Materials and fixtures required are determined from proposed design.
- Sustainability principles and concepts are applied to work preparation and application.
- Plans are recorded in accordance with workplace requirements.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification..
- Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
- Documentation is completed in accordance with workplace requirements.