Elements and Performance Criteria
- Prepare for work.
- Plans and specifications are obtained and fixture position is determined.
- Safety (OHS) requirements associated with installing sewage discharge pipes, and workplace environmental requirements, are adhered to throughout the work.
- Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
- Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements.
- Tools and equipment for installing sewage discharge pipes, including personal protective equipment, are selected and checked for serviceability.
- Work area is prepared to support efficient installation of sewage discharge pipes.
- Identify installation requirements.
- Position of discharge pipes is determined in accordance with plans and specifications, relevant Australian standards, site requirements and other relevant information and does not cause damage or interference to surrounding structures.
- Quantity and type of materials required are calculated from design drawings and specifications and comply with relevant Australian standards and authorities' requirements.
- Allowances for fabrication and assembly are determined and transferred.
- Materials and equipment are identified, ordered and collected in accordance with workplace procedures.
- Materials and equipment are checked for compliance with relevant Australian standards, docket and order form, and for acceptable condition.
- Sustainability principles and concepts are applied to work preparation and application.
- Install and test pipe system.
- Pipe system is set out to comply with plans, specifications and relevant Australian standards.
- Fixings and supports are installed to manufacturer recommendations, job plans and specifications, and relevant Australian standards.
- Pipes are installed and jointed in accordance with relevant Australian standards, without damage or distortion to pipework, surrounding environment and other services.
- Pipe system is tested to comply with relevant Australian standards and adjusted.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.
- Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
- Documentation is completed in accordance with workplace requirements.