Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for planning.
  2. Identify system requirements.
  3. Plan service and system layout.
  4. Restore work area.

Required Skills

Required skills

Required skills for this unit are

communication skills to

access information

enable clear and direct communication using questioning to identify and confirm requirements share information listen and understand

follow instructions

organise and sequence tasks with others

plan and sequence tasks with others

read and interpret

documentation from a variety of sources

regulations relevant Australian standards plans specifications and drawings

use language and concepts appropriate to cultural differences

use and interpret nonverbal communication such as hand signals

written skills to

complete workplace documentation including work backup

record plans

identifying and accurately reporting to appropriate personnel any faults in tools equipment or materials

identifying requirements including system requirements

numeracy skills to apply measurements and calculations

organisational skills including the ability to plan and set out work

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to

access and understand sitespecific instructions in a variety of media

use mobile communication technology

Required knowledge

Required knowledge for this unit is

accessing information and the processes for calculating material requirements

characteristics and application of different pipes and fittings including fixing and joining techniques and methods

characteristics and application of water heating systems

characteristics and application of water pumps and water storage tanks for multiple floor buildings

drafting techniques which may include the use of computers and computeraided design CAD software

job safety analysis JSA and safe work method statements SWMS

levelling and alignment processes

process of designing sizing and documenting the layout of heated tempered and cold water services and systems

properties of water including pressure and flow rates

relevant statutory and authority requirements related to the designing sizing and layout of heated tempered and cold water services and flushing systems fire hydrant and hose reel systems including nondrinking water requirements

relevant statutory and authority requirements related to the designing sizing and layout of both mains pressure and low pressure flushing devices

selection for installation of thermostatic mixing valves

selection for installation of backflow prevention devices

SI system of measurements

Australian standards applicable to the service and system

water treatment processes

workplace and equipment safety requirements

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or projectbased assessment techniques fully replicate plumbing and services workplace conditions materials activities responsibilities and procedures

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of

locating interpreting and applying relevant information Australian standards and specifications to the design sizing and layout of heated tempered and cold water services and systems

applying safety requirements throughout the work sequence including electrical personal protective clothing and equipment

as a minimum the ability to design size the layout of

a cold heated and tempered water supply system for a building with a minimum of six floors including a nondrinking supply

a flush valve system for a multifloor complex for a building with a minimum of six floors

a hydrant and hose reel system for a building with a minimum of six floors ensuring

correct identification of location design and details of proposed services and systems

correct selection and use of appropriate processes tools and equipment

completion of all work to specification

compliance with regulations relevant Australian standards and organisational quality procedures and processes

application of sustainability principles and concepts

communicating and working effectively and safely with others

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices safety requirements and environmental constraints

Assessment of essential underpinning knowledge will usually be conducted in an offsite context

Assessment is to comply with relevant regulatory or Australian standards requirements

Resource implications for assessment include

an induction procedure and requirement

realistic tasks or simulated tasks covering the minimum task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe working practices and addressing hazards and emergencies

material safety data sheets

research resources including industry related systems information

Reasonable adjustments for people with disabilities must be made to assessment processes where required This could include access to modified equipment and other physical resources and the provision of appropriate assessment support

Method of assessment

Assessment methods must

satisfy the endorsed Assessment Guidelines of the Construction Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments

Validity and sufficiency of evidence requires that

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the persons demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct indirect and supplementary evidence

Assessment processes and techniques should as far as is practical take into account the language literacy and numeracy capacity of the candidate in relation to the competency being assessed

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties such as existing supervisors team leaders or specialist training staff


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Safety (OHS) is to be in accordance with commonwealth, state and territory legislation and regulations and may include:

handling of materials

hazard control

personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including recognising and preventing hazards associated with:

electricity

hazardous materials and substances

other machines

surrounding structure and facilities

trip hazards

underground services

use of tools and equipment

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

use of firefighting equipment

use of first aid equipment

workplace environment and safety.

Environmental requirements cover water quality management and may include:

clean-up protection

stormwater protection

waste management.

Statutory and regulatory authorities include:

commonwealth, state and local authorities administering applicable Acts, regulations and codes of practice.

Tools and equipment may include:

computers running appropriate CAD software

drawing instruments

measuring equipment.

Information may include:

charts and hand drawings

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions

material safety data sheets (MSDS)

memos

organisation work specifications and requirements

regulatory and legislative requirements, particularly those pertaining to:

building codes

OHS and environmental requirements

plumbing regulations

relevant Australian standards, including AS/NZS3500 National plumbing and drainage set

safe work procedures relating to designing, sizing and documenting the layout of heated and cold water services and systems

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.

Water services and systems include:

drinking water from a water meter or storage tank to a point of discharge or storage

fire hydrant and hose reel systems

heated and tempered water service to a point of discharge

flushing systems

non-drinking water from a source to a point of discharge or storage.

Point of discharge may be:

fixture

isolating valve.

Materials may include:

building plans

job specifications

manufacturer specifications.

Sustainability principles and concepts:

cover the current and future social, economic and environmental use of resources

may include:

efficient design principles to minimise environmental impact

efficient use of material in the design, including recycling of material

efficient energy and water use

disposal of waste material to ensure minimal environmental impact.