Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Define and plan scope of own contribution to design project.
  2. Review design documentation at required stages of design process.

Required Skills

Required skills

language and literacy skills to

exchange complex information with people from diverse backgrounds using relevant language and format

interpret complex legal and technical documents regarding accessibility such as

Australian and international standards

National Construction Code NCC deemedtosatisfy requirements performance requirements and alternative solutions

Disability Access to Premises Buildings Standards known as the Premises Standards PS

Disability Discrimination Act

research papers

numeracy skills to

perform and interpret design calculations

assess costeffectiveness of solutions

planning and organising skills to

manage documentation

meet timelines for service provision

problemsolving skills to select and adapt practical and costeffective solutions to access and use issues

technical skills to

interpret design documentation including visualising environments in threedimensions D and conducting a cognitive walk through of environments applying access and use principles

develop and describe solutions to access and use issues

technology skills to

exchange project documentation

prepare reports

Required knowledge

access and use compliance requirements including but not restricted to

codes

guidelines

legislation

local authority policies

protocols

regulations

standards

accessibility requirements relating to equipment used by people with disabilities such as

assistance animals

audio frequency induction loops

braille and tactile signage

long white canes

TTY telephones

walking frames

wheelchairs

best practices in access and use including measures that exceed compliance requirements

building and construction industry processes roles and terminology

construction and manufacturing design principles and processes including

access and use principles

adaptable design to accommodate changes over lifecycle of project

costeffectiveness

sustainability

gaps and trends in interrelation of and conflict between compliance requirements

policy development legislative and regulatory frameworks relating to access to and use of the built environment and infrastructure

principles of access to and use of the built environment and infrastructure including

adaptable design

best practice solutions to access and use requirements

principles of ergonomics and human geometry

types of disabilities and combinations of disabilities and related range of functional limitations including

auditory

cognitive

mobility

muscle wasting and weakness

psychiatric

vision

scope of functions of the human body including

auditory and visual processing

cognitive functions

mobility

psychiatric conditions

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the required skills and knowledge specified in this unit

In particular the person should demonstrate the ability to

scope and plan consultancy service levels for contributing to the design of two different development projects

one premises construction

one transport infrastructure conveyances facilities and systems

exchange and store design documentation following agreed protocols

review design documentation at agreed stages of each project and report on access design issues

propose practical and effective solutions to access issues and develop specifications for selected solutions

Context of and specific resources for assessment

Assessment of essential underpinning knowledge may be conducted in an offsite context and is to comply with regulatory and Australian standards requirements

Resource implications for assessment include access to

design briefs policies drawings and other relevant documentation for two projects

one premises construction development project

one transport infrastructure conveyances facilities and systems development project

relevant legislation codes standards and guidelines

relevant design and construction specialists

relevant premises transport infrastructure conveyances facilities and systems development projects and work sites

Method of assessment

Assessment methods must

satisfy the endorsed Assessment Guidelines of the CPP Property Services Training Package

satisfy the endorsed Assessment Guidelines of the CPP07 Property Services Training Package

include direct observation of tasks in real or simulated work conditions with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments

Guidance information for assessment

This unit could be assessed on its own or in combination with other units relevant to the job function

Reasonable adjustments for people with disabilities must be made to assessment processes where required This could include access to modified equipment and other physical resources and the provision of appropriate assessment support

Assessment processes and techniques should as far as is practical take into account the language literacy and numeracy capacity of the candidate in relation to the competency being assessed


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Nature of project may include:

client, such as:

community-based organisation

government department

individual

private company

extent and type of stakeholder involvement

location

timeframe

type and purpose of transport infrastructure and facilities or urban space development project.

Design documentation may include:

access and use policy and brief

concept design or schematic

design brief

design drawings and specifications

master plan.

Development projects may include:

urban space and transport infrastructure and facilities, including:

communication systems

parks, gardens and open spaces

public streetscapes

public transport stops, stations and vehicles

signage

tunnels

wayfinding

building and construction of premises, including:

aged care facilities

art galleries

car parks

cinemas

conference and function spaces

factories

hospitals and medical facilities

hotels

mine camps

museums

office buildings

petrol stations

places of worship

police stations

prisons

recreational public buildings

residential accommodation

schools

shopping malls

swimming pools

universities

warehouses.

Access and use compliance requirements may include:

Australian and international standards

Disability Discrimination Act and regulations and amendments

Disability (Access to Premises – Buildings) Standards

Disability Standards for Accessible Public Transport (DSAPT)

Disability Standards for Education

NCC, including:

deemed-to-satisfy solutions

formulation of performance-based alternative solutions

state, territory and local authority legislation, regulations and planning requirements.

Stages of design process may include:

concept sketch

schematic

design development

working drawing

specifications

contract document.

Details of access and use design issues may include:

accurate and complete compliance specifications

disparity between design and compliance specifications

access and use requirements of occupier or user demographic that are not the subject of compliance specifications and are not addressed in the design documentation; and associated risks of exclusion

risks associated with non-compliance.

Solutions to access and use issues include:

meeting compliance requirements, including:

alternative solutions

deemed-to-satisfy solutions

exceeding compliance requirements

not meeting compliance requirements supported by an opinion of the success of a defence on the grounds of unjustifiable hardship

not meeting compliance requirements accompanied by a statement supporting application of full or partial exemption from the requirements of the NCC as applied by state or territory legislation.

Access and use issues arising during the construction phase of projects may include:

budgetary constraints

conflict with ‘as built’ structure and services

errors in interpretation and implementation of access and use design features

unavailability of specified equipment or materials.