Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan documentation production.
  2. Prepare and gather documentation.
  3. Submit and support building approval application.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Documentation must include:

contract administration documentation

items specified in relevant authorities’ requirements for building approval, including:

localised pest management details

relevant authority forms

requests for exemptions

risk assessments

specifications for materials, fixtures and fittings

technical reports, such as:

access

conservation

energy rating

fire safety

soil analysis

two- and three-dimensional working drawings

sub-floor ventilation details

waterproofing details.

Compliance requirements must include:

current Australian standards applicable to the building design

federal, state or territory, and local authority legislation and regulations applicable to the building design

National Construction Code.

Working drawings must include:

detail drawings

elevations

location of neighbouring buildings

plans

sections

site plans.

Checking of working drawings must include:

accuracy

completeness

compliance with relevant requirements, including building approval requirements

consistency of presentation

cross-referencing

titles and reference numbers

version control.