Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Provide professional advice and support to clients and contractors during construction

Required Skills

Required skills

administration and management skills to

manage documents

manage time including planning and prioritising work

analytical and problemsolving skills to

evaluate defect resolution strategies

review and evaluate project processes

interpersonal skills to interact with clients contractors and other professionals

language literacy and numeracy skills to

communicate with clients colleagues and project contacts including

negotiating

note taking

writing formal letters and reports

interpret complex information

take measurements and perform calculations at site inspections

technical skills to

amend drawings and specifications

identify building defects

technology skills to use information technology and relevant software

Required knowledge

architectural styles and terminology

construction materials and methods applicable to clients projects

construction project completion processes

defects arising in construction projects and potential solutions

key features of building life cycles

legislation codes and standards relevant to smallscale building design projects including

contract compliance

drawing standards

OHS duties of designers

organisational scope of business service levels and fees

principles of building design including sustainable design

range of organisational services and nominal fees

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person should demonstrate the ability to

provide technical advice and support to clients and contractors according to contractual obligations and workplace procedures

conduct defect inspections and negotiate defect resolutions

finalise project documentation

contribute to building design process improvement strategies

Context of and specific resources for assessment

Assessment of this unit

must be in the context of the work environment

may be conducted in an offsite context provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance including task skills task management skills contingency management skills and job role environment skills

must meet relevant compliance requirements

Resource implications for assessment include

access to

suitable assessment venue and equipment

suitable simulated or real opportunities and resources to demonstrate competence

assessment instruments

Method of assessment

Assessment for this unit must verify the practical application of the required skills and knowledge using one or more of the following methods

written andor oral assessment of the candidates required knowledge for the unit

observed documented andor firsthand testimonial evidence of the candidates

implementation of appropriate procedures and techniques for the safe effective and efficient achievement of the required outcomes

identification of the relevant information and scope of the work required to meet the required outcomes

identification of viable options and the selection of options that best meet the required outcomes

consistently achieving the required outcomes

Guidance information for assessment

This unit could be assessed on its own or in combination with other units relevant to the job function

Where applicable physical resources should include equipment modified for people with disabilities

Access must be provided to appropriate learning andor assessment support when required

Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Small-scale building design projects:

include buildings covered by the BCA, except construction Type A buildings

may be residential projects, such as:

additions and renovations

heritage restoration

new buildings

may be commercial or industrial projects, such as:

factories

motels

offices

restaurants

retail and service outlets

warehouses.

Professionals may include:

access consultants

building surveyors

certifiers

quantity surveyors.

Stages of building completion may include:

practical completion

final completion or handover

end of defect liability period.