Elements and Performance Criteria

  1. Prepare for open pit mine survey.
  2. Plan open pit mine survey.
  3. Carry out open pit mine surveying tasks.
  4. Finalise and report open pit mine survey outcomes.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Appropriate persons must include at least two of the following:

client

colleague

engineer

manager

site personnel

registered or qualified surveyor

supplier.

Required mining methods must include at least two of the following:

developing roads and ramps

drilling

removing interburden

pre-stripping

stockpiles, dumps and safety berms

tailings dams.


Performance Evidence

A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit. The person must also conduct open pit mine surveys for two different projects.

While conducting the above open pit mine surveys, the person must:

interpret relevant plans and documents to plan surveying project processes and activities

communicate clearly with clients and stakeholders to clarify and report project information

comply with organisational policies and procedures, standards, regulations and legislation relating to surface mining when planning for:

blasting

drainage and dewatering

dumps and stockpiles

equipment use

records and reporting

standards and quality

surveying tasks

work health and safety

create mine drawings and capture and reduce data to calculate mine volumes

perform calculations to measure, reduce and validate spatial data captured from open pit mine surveying

measure survey components using two of the following pieces of surveying equipment:

global navigation satellite system (GNSS)

level

remote sensing

tape

total station

plan and implement project management mechanisms to ensure open pit mine surveying operations are completed within required timeframes and comply with project specifications

prepare and document project plans that detail:

required surveying equipment

surveying objectives and deliverables

strategies for risk and contingency management

work processes and timeframes

work safely, using personal protective equipment (PPE) when performing surveying tasks.


Knowledge Evidence

A person demonstrating competency in this unit must demonstrate knowledge of:

accuracy and precision requirements for surveying data

basic characteristics of common ore deposits

data capture and set-out techniques

data reduction and manipulation techniques

explosives, blasting and blasting practices applicable to mining operations

mineral exploration methods, including geophysical, geochemical and geological techniques

mining methods, including:

developing roads and ramps

drilling

removing interburden

pre-stripping

stockpiles, dumps and safety berms

tailings dams

organisational policies and procedures relating to:

client and stakeholder communication

records and reporting

using the surveying equipment specified in the performance evidence

work health and safety

project management techniques for scheduling, measuring and monitoring work progress

specialised surveying equipment requirements and accessibility in relation to open pit mining

techniques for wall monitoring to derive a suitable pit wall slope, including:

batter stakes

measuring and recording ground cracks

required prism locations

toe and batter checks

terminology and nomenclature applicable to surface mining.