Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan camera support installation
  2. Erect camera platforms and towers
  3. Prepare cranes for cameras
  4. Attach and secure cameras
  5. Disassemble tracks, platforms and towers

Performance Evidence

Evidence of the ability to:

plan safe installation of camera supports to meet production requirements

undertake pre-shoot checks of equipment and supplies

erect safe camera towers and platforms and attach camera mounts in line with production requirements

construct a variety of rigs for moving and static objects safely

deconstruct and remove camera supports at conclusion of shoots safely

apply work health and safety (WHS) guidelines when working with electrical equipment, camera cranes and supports.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.


Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

outline roles and responsibilities of production and crew members involved in installing camera supports

identify typical problems that arise in the context of installing camera supports for film and television shoots, and briefly describe solutions

describe features of support equipment used to mount a range of cameras

explain basic techniques for harnessing, rigging and fastening when mounting cameras on supports

describe WHS regulations and requirements that apply to installing camera supports.