Elements and Performance Criteria
- Plan lighting for outdoor events
- Determine lighting requirements in consultation with relevant personnel and with reference to production documentation
- Review regulations that affect the design of outdoor lighting systems, with particular reference to environmental and insurance requirements
- Assess venues or sites to identify availability of power and other issues to be considered when setting up outdoor lighting systems, and plan for contingencies
- Do a job safety analysis of tasks and incorporate health and safety considerations into overall planning
- Develop schedules of outdoor lighting system requirements, with specific reference to additional infrastructure and equipment requirements
- Reach agreement on final configuration of outdoor lighting systems, allowing adequate time for installation and testing prior to events
- Install lighting systems for outdoor events
- Complete checks to ensure availability of all resources prior to installation
- Supervise the connection of control systems
- Monitor progress of lighting system installation against work plans and implement contingency plans as required to ensure that production deadlines are met
- Ensure that all work activities comply with health and safety and industry award guidelines
- Progressively test aspects of lighting system installation to check that required lighting effects can be achieved
- Use the services of licensed personnel to complete specialised work as required
- Liaise with relevant personnel during installation to ensure efficiency of installation and maximum cooperation
- Review finished installation with relevant personnel and make adjustments as required
- Monitor outdoor lighting operations
- Monitor weather and overall quality of lighting and take action to rectify problems
- Communicate with colleagues during operation to share information and ensure quality of productions
- In consultation with relevant personnel, evaluate effectiveness of outdoor lighting operations and note areas for future improvement