Elements and Performance Criteria
- Prepare for set construction
- Confirm set construction requirements in consultation with relevant personnel and with reference to production documentation
- Discuss visual interpretation of production requirements and ways in which they could be realised
- Reach agreement on scope of own work and construction deadlines
- Take measurements for set elements and amend scale drawings as required
- Prepare equipment, tools and materials according to design specifications and construction techniques to be used
- Construct set elements
- Construct set elements in a logical order and within production timelines
- Follow safety procedures during the construction process according to organisational requirements
- Participate in ongoing trials to establish the best results, determine the effect of lighting and solve problems that arise during the construction phase
- Identify different approaches that could enhance the final outcome and incorporate them into work processes
- Label and code partially finished set elements for identification during the construction phase
- Finalise set construction
- Complete fireproofing according to relevant state/territory health and safety legislative requirements
- Liaise with relevant personnel to check set elements for accuracy and compliance with design and construction specifications
- Adjust set elements to take account of feedback and discussions, and update documentation as required
- Store sets according to organisational procedures and in ways that avoid loss or damage
- Clean, maintain and store tools, equipment and materials according to workplace and safety requirements
- Contribute to evaluations of set construction processes and note ways to improve own work performance