Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Determine performance requirements
  2. Specify stage monitor system
  3. Set-up equipment and prepare for performance
  4. Tune, equalise and adjust system for performance
  5. Liaise with performers on requirements
  6. Prepare sound mixing console for operation
  7. Operate console during production
  8. Complete work operations

Required Skills

Required skills

literacy skills sufficient to interpret production documentation draw diagrams

numeracy skills sufficient to work with measurements and numerical aspects of audio consoles

Required knowledge

types of information required to plan stage monitor system

features of different types of stage monitor systems for different contexts including different equipment requirements

particular issues and challenges associated with stage monitor systems

safety issues associated with the setup and installation of stage monitor systems

issues associated with foldback mixing for different applications eg concert theatre

techniques for equalisation of foldback speakers

Evidence Required

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The following evidence is critical to the judgement of competence in this unit

ability to plan setup and operate a stage monitor system that meets production and performer requirements

knowledge of stage monitoring equipment and the range of issues and challenges associated with operation of the equipment in a live production environment

Context of and specific resources for assessment

The assessment context must provide for

practical demonstration of skills through the planning setup and operation of stage monitor systems for more than one live production

involvement of and interaction with a production team and performers to reflect the collaborative nature of the process

use of industrycurrent equipment

Method of assessment

Assessment may incorporate a range of methods to assess performance and the application of essential underpinning knowledge and might include

evaluation of foldback quality where the candidate is responsible for setup and operation

discussion with performers for whom the candidate has setup and operated stage monitor systems

case studies to assess ability to plan and setup stage monitor systems for different contexts

oral or written questioning to assess knowledge of equipment setup procedures and safety issues

review of portfolios of evidence and third party workplace reports of onthejob performance by the candidate

Assessment methods should closely reflect workplace demands and the needs of particular groups eg people with disabilities and people who may have literacy or numeracy difficulties such as speakers of languages other than English remote communities and those with interrupted schooling

Guidance information for assessment

Assessment of this unit requires access to

industrycurrent stage monitor equipment

venue where stage monitor system can be setup and operated


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information required to plan stage monitor system may include:

input sources

performance schedule

performance style

stage layout

Requirements for stage monitor system set-up and checking may include:

need for a clear stage

sound check with performers

stage monitor system equalisation with non-essential personnel removed from the stage area

Stage layout diagram would include positioning of:

establishment of adequate balanced lines available from splitter system for stage monitors

monitor speakers

multicore stage box

processing and amplification racks

stage monitor console

In-ear or wireless equipment and accessories may include:

batteries

reverb or external effectors

stands/microphone mounts

Checks to be undertaken when setting up stage monitor system include:

phantom power switches off

position of equalisation controls

re-setting of external processing gear to flat (if EQ)

setting of external effectors or signal enhancers start-up position

setting of send controls