Elements and Performance Criteria
- Establish mobile field shower system
- Appropriate site is chosen for the shower unit.
- Assemble sequence is conducted correctly without a breach of safety, damage to the equipment or injury to personnel.
- Occupational health and safetyWork health and safety (OH&SWHS) requirements and recognised safety precautions are applied throughout.
- Mobile field shower system is operated correctly in accordance with standard procedures.
- Monitor the mobile field shower system
- Maintain mobile field shower system
- Cleaning cycle is conducted in accordance with standard procedures, to ensure efficient operation of the unit.
- Personal protective equipment is used when working with chemicals.
- Chemicals are monitored, changed and disposed of correctly to prevent pollution to the environment.
- Filters are changed and tested in accordance with standard procedures and disposed of correctly to prevent pollution to the environment.
- Fault finding inspections are conducted and operating faults are rectified within one’s are of responsibility or reported in accordance with standard procedures.