Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare and plan for gap crossing
  2. Construct gap crossing
  3. Dismantle gap crossing and refurbish site and equipment
  4. Prepare and plan for gap crossing
  5. Construct gap crossing
  6. Dismantle gap crossing and refurbish site and equipment

Performance Evidence

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

commanding and controlling situations and people

managing resources

operating optical levelling and surveying devices

producing design/plans

producing written and verbal reports

recording and processing data and information

taking and recording accurate measurements

leading a team to construct, maintain and dismantle a multi span bridging of not less than thirty metres made from modularised or improvised means


Knowledge Evidence

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

anchorages

booming procedures and centre of gravity

equipment bridge design features/requirements:

site requirements (reconnaissance):

location

gap width, depth, obstacles, etc.

current and direction

angle of repose

abutment design or enhancement

soils testing and compaction methods

routes in/out

parts

specifications

user manual,

material handling equipment requirements and support

construction sequence

designed traffic/load (MLC/tonnage)

above ground or surface (stepped abutment)

equipment bridge types:

medium girder bridge (MGB)

air portable bridge (APB)

rapid emplacement bridge (REB)

line of communication bridge (LOC)

bailey bridge, acrow bridge (FMB)

jacking system

mathematics to a level necessary to meet all design and construction requirements

types of bridge category:

single span, multi span,

simply supported or continuous

variations in construction sequences:

restricted sites

floating piers

multiple piers