Elements and Performance Criteria
- Prepare to use EPTs underwater
- Identify and analyse work task and worksite data to determine EPT specific requirements
- Develop work plan consistent with dive plan
- Select, inspect and prepare EPTs, explosive charges and protective equipment in accordance with work plan
- Secure EPTs and explosive charges safely to/from dive site
- Identify obstructions and other hazards, to determine risks and to manage appropriate risk control measures
- Operate EPTs underwater
- Secure EPTs and explosive charges on self in accordance with operational and safety procedures
- Ensure material or base set out intended for explosive fasteners complies with detailed drawings and work plan specifications
- Install EPT attachments and chamber EPT charges in accordance with manufacturer specifications
- Determine safe work area, and confirm location of other divers prior to commencing work task/s in accordance with work plan
- Operate EPTs under water safely and manage identified risks
- Clear and render safe EPTs in accordance with manufacturer specifications
- Check fastener penetration for angle, depth and integrity of base in accordance with work plan
- Complete underwater EPT operations