Elements and Performance Criteria
- Determine requirements for hydro-cooling
- Key steps in the process of hydro-cooling are identified
- Impact of timing and temperature on the hydro-cooling process are identified
- Produce for hydro-cooling is identified and specific cooling and transfer requirements confirmed
- Consequences of incorrect hydro-cooling are identified
- Equipment performance is checked and adjusted as required
- Pre-start checks are carried out as required by workplace requirements
- Goods are located in correct storage areas to meet storage temperature, stores handling and stock rotation requirements
- Stores information is recorded according to workplace requirements
- Conduct hydro-cooling
- Storage facility is checked for readiness and allocation of space for produce confirmed
- Handling equipment is used to transfer produce in a manner that is safe and maintains produce quality
- Operating parameters for hydro-cooling equipment are set as required to meet safety and cooling requirements
- Hydro-cooling is applied to produce
- Produce is transferred to storage
- Process information is recorded according to workplace requirements
- The work area is maintained according to housekeeping standards
- Work is conducted in accordance with workplace environmental guidelines
- Monitor hydro-cooling process