Elements and Performance Criteria
- Prepare the cooling tower/s for operation
- Tower cleaning procedures are followed and cleaning records completed
- Chemicals are available and delivery systems are ready for operation
- Make-up water supply is available and meets quality requirements
- Pre-operational checks are conducted
- Health and safety hazards/maintenance requirements are identified and reported to appropriate personnel according to workplace reporting procedures
- Start and monitor cooling tower
- 2.1 The cooling tower system is started according to workplace procedures and manufacturer's recommendations
- 2.2 Plant is operated within limits of manufacturer's specifications to meet workplace requirements
- Equipment is monitored to confirm operating condition and cleanliness
- Water quality is monitored, tested and adjusted as required
- The workplace meets housekeeping standards
- Analyse and respond to abnormal performance
- Water condition and plant operating conditions are analysed to identify causes of abnormal performance
- Corrective action is taken in accordance with workplace procedures in response to hazards, out-of-specification test results and/or abnormal plant performance
- 3.3 Emergency procedures are implemented as required according to workplace procedures and manufacturer's recommendations
- Shutdown and clean the cooling water system
- The timing and sequencing of cooling water system shut down meets production requirements
- Record information