Elements and Performance Criteria
- Prepare to bench graft vines
- Bench graft vines
- Cuttings are disbudded according to workplace procedures
- Cuttings are bench grafted according to workplace procedures
- Graft is treated and/or taped according to workplace procedures
- Grafting process and equipment are monitored to ensure results are maintained within specifications
- Out-of-specification process and equipment performance are identified, rectified and/or reported
- Complete bench grafting activities
- Equipment is shut down, cleaned and maintained as required
- Grafted vines are packed, labelled and stored according to instructions
- Waste generated by both the process and cleaning procedures is collected, treated and disposed of according to workplace procedures
- Work is conducted in accordance with workplace environmental guidelines
- Record information