Elements and Performance Criteria
- Inspect irrigation system
- Maintain irrigation system
- Cleaning and maintenance materials are prepared as required
- Irrigation system is cleaned according to instructions
- Routine preventive maintenance is carried out according to instructions
- Waste generated by both the cleaning and maintenance procedures is monitored, collected, treated, disposed of or recycled according to workplace procedures
- Work is conducted in accordance with workplace environmental guidelines
- Record information